Work experience in subway and railways

Row Project's name Date
1 The study of up to dating traffic density for Kermanshah railway in horizon plan
2 Traffic counts controlling of subway system (Kermanshah)
3 Feasibility study of subway system (Kermanshah)
4 Rehabilitation and Feasibility study of Mashhad subway , Line 2,3,4
5 The study of system selection for railway transportation of Tehran
6 Route and station determination for Tehran subway, line 3
7 Optimization of Process operating for Iran railway
8 The study of system selection for railway transportation of Tehran (selective corridors)
9 The study of railway transportation for Karaj and suburban
10 Traffic counting design in origin and destination method for Tehran subway, Line 1,2,5
11 Traffic counting of Tehran-Karaj subway
TOP