Work experience in subway and railways
Row |
Project's name |
Date |
1 |
The study of up to dating traffic density for Kermanshah railway in horizon plan |
|
2 |
Traffic counts controlling of subway system (Kermanshah) |
|
3 |
Feasibility study of subway system (Kermanshah) |
|
4 |
Rehabilitation and Feasibility study of Mashhad subway , Line 2,3,4 |
|
5 |
The study of system selection for railway transportation of Tehran |
|
6 |
Route and station determination for Tehran subway, line 3 |
|
7 |
Optimization of Process operating for Iran railway |
|
8 |
The study of system selection for railway transportation of Tehran (selective corridors) |
|
9 |
The study of railway transportation for Karaj and suburban |
|
10 |
Traffic counting design in origin and destination method for Tehran subway, Line 1,2,5 |
|
11 |
Traffic counting of Tehran-Karaj subway |
|